The Quadricycle Build Story
12th March 2010
Construction has now moved to my garage:
The main two length-ways tubes looking from what will be the back of the quad (these are upside down in this picture):

All four length-ways beams with all of their brackets attached, and laid out in approximate positions, looking from what will be the front:

And again, but looking from the back:

As you can see, I've been busy grinding, drilling and bolting my right angle brackets which will join the tubing that runs the length with that which runs the across the width.
Pevious - 8th March 2010
Next - 17th March 2010
|