IRWDesign.com
 
Home
Portfolio
Contact  



The Quadricycle Build Story

12th March 2010

Construction has now moved to my garage:

The main two length-ways tubes looking from what will be the back of the quad (these are upside down in this picture):
Posted Image

All four length-ways beams with all of their brackets attached, and laid out in approximate positions, looking from what will be the front:
Posted Image

And again, but looking from the back:
Posted Image

As you can see, I've been busy grinding, drilling and bolting my right angle brackets which will join the tubing that runs the length with that which runs the across the width.

Pevious - 8th March 2010

Next - 17th March 2010